Below is a listing of some of the new feature that are intergrated into the New Village of Ridgewood Website
-Searchable Content -Linked with both Twitter & Facebook Pages -Linked with Public Access Channel (Optimum 77 and FIOS 35) -New Community Calendar - Subscribe to Categories by RSS feeds -Business Directory - Allows business to register and update content -Organized Forms Page -News Archive -E-News registration -I Want to... and Side bar menu for instant access to most common used links -Gallery of Event both old and new -Youtube link into event videos -Boards and Committees Pages -Resident Newcomers Page -Media Archive of Past Council Meetings via Ustream.
and Many More.....
We will be updating this page with new features. If you have any sugestions or feedback, please click the orange tab located at the right side and let us now.
Construction work must be inspected as required by the New Jersey Uniform Construction Code, N.J.A.C. 5:23-2.18. The Building Department will conduct inspections as often as is necessary to insure that all work conforms to the approved plans and the regulations. Building Department office hours are Mondays through Fridays 8:30-4:30.
TO SCHEDULE INSPECTIONS: CALL 201-670-5500 ext. 5506 at least 24 hours in advance. Please include your permit number, type of inspection, worksite address, and callback number. Do not leave inspection requests on voicemail.
Building Inspections -- Daily 9:00-3:00
Electric Inspections -- Daily 9:00-3:00
Plumbing Inspections -- Daily 8:30-4:30
Fire Inspections CALL 201-670-5500, ext. 5480
You may request morning or afternoon inspections and we will do our best to accommodate you. Scheduling is subject to availability. Inspections may be scheduled online by using the SDL Permit and Inspection Portal.
REQUIRED INSPECTIONS FOR ALL SUBCODES:
*** Footings
*** Foundation prior to backfill
*** Slab
*** Insulation prior to covering
*** Sheathing;
*** Framing, prior to insulating and exterior covering, and only after rough plumbing and electrical inspection approvals have been given
*** Rough plumbing
*** Final plumbing
*** Rough wiring
*** Final wiring
*** Fire alarm systems, sprinkler systems, and other fire protection systems
Inspections during the work are intended to cover structural framing and connections prior to covering with finish material; plumbing underground services, rough piping, water service, sewer or septic service, storm drains; electrical rough wiring, panels and service connections and installations; mechanical equipment, such as duct work and heating system piping; insulation prior to covering; underground fuel tanks and lines; gas or fuel oil distribution piping; and any other work hidden when the job is completed.
FINAL INSPECTIONS ARE REQUIRED for each subcode area in which a permit is issued: BUILDING ELECTRICAL PLUMBING FIRE
Final inspections are intended to cover installation of all wall, floor and ceiling finish materials; sealing of exterior joints; plumbing piping and fixture placement; electrical wiring, devices and fixture placement; all mechanical equipment; fire and life safety equipment, such as emergency lighting, exit signs, detectors and sprinklers.
APPROVED PLANS MUST BE KEPT ON THE JOB SITE AT ALL TIMES. IF THE INSPECTOR IS NOT ABLE TO REVIEW THE APPROVED PLANS ON THE JOB, THE INSPECTION WILL NOT BE CONDUCTED. The Construction Official or the subcode officials may require additional inspections. If you have any questions regarding the number or timing of inspections, please call the subcode official at the telephone number above.
MISSION: Green Ridgewood, formerly known as Ridgewood Environmental Advisory Committee, assists the Village Council in long-range planning with respect to environmental issues. Green Ridgewood anticipates environmental problems, researches and recommends solutions.
MEMBERS:
David Refkin (Chairman)
Caitlin O'Leary
Nurhan Ezik
Yvone Nava
Beth Gould Creller
Justin Manger
Justin Jonsson
Sophia Florida
Tessa Florida (Student Representative)
Pamela Perron (Village Council Representative)
Saurabh Dani (Board of Education Representative)
Frank Mortimer (Parks & Recreation Conservation Board Representative)
Jill Fasano (Village Staff Member)
GREEN TEAM is a subcommittee of Green Ridgewood.
MISSION: The Green Team is devoted to completing the requirements for Sustainable Jersey certification and to educating Village residents regarding green initiatives.
MEMBERS:
Anthea Zito
Anthony Mauriello
Pamela Perron (Village Council Representative)
Christopher Rutishauser (Village Staff Member)
Michael Faherty
Roman SanDoval
Derek White
Adam Peterseil
Sofia Morino (Student Liaison Representative)
To contact Green Ridgewood and the Green Team, e-mail: greenridgewoodnj@gmail.com
For additional information see the website at www.greenridgewoodnj.org
Green Ridgewood and the Green Team hold joint meetings on the 1st Thursday of each month at 7:00 p.m. in the Senior Lounge, Village Hall. Meetings are open to the public.
July 2023
UPDATE
The Village of Ridgewood (“Village”) has created a Community Energy Aggregation program, known as the Encouraging Alternative Green Energy for Ridgewood (“EAGER") Program, with the goal of using bulk purchasing power to procure electric power supply on behalf of residents, with a higher renewable content and at the same or lower price than power supply provided by PSE&G. Since the creation of the program earlier this year, EAGER and its energy agent, Gabel Associates, Inc. (“Gabel”), have been closely monitoring the energy market for savings opportunities. EAGER will go out to market as soon as conditions warrant and will notify residents if and when a contract is signed, and the program becomes active. Please monitor the Village website for any updates. See below for further details.
EAGER has been monitoring market conditions, in consultation with its energy consultant, Gabel Associates, Inc., for opportunities to achieve the program’s goal of obtaining electric power supply for residents with higher renewable content and at the same or lower price than power supply provided by PSE&G. While energy market prices have abated somewhat from their peaks in Fall 2022, prices remain significantly higher than they were a couple of years ago.
In February 2023, the utility, PSE&G, completed their annual wholesale power auction to procure energy supplies for their Basic Generation Service (BGS) customers. On the energy consultant’s recommendation, EAGER awaited the announcement in Spring 2023 of the utility’s wholesale power auction results and the resultant retail tariff prices which became effective June 1st for this coming year. (Utility tariff prices run on an annual cycle from June 1st through May 31st and incorporate utility auction results from the prior three years. In the case of rates effective June 1, 2023, the tariffs incorporate 2021, 2022 and 2023 BGS auction results). After these new tariff rates were announced, EAGER has been better able to assess whether there is a near term opportunity for this program to achieve its goals.
Upon review of the new utility tariff rates, EAGER and Gabel have concluded that the new PSE&G rates effective June 1, 2023, have increased somewhat over prior the year’s rates; and in conjunction with modest improvements in energy market conditions, the gap between utility and supplier rates has somewhat narrowed. However, despite the narrowing of this gap, utility rates are still slightly more favorable to Ridgewood residents at this time than third party supplier rates. Therefore, near-term, the lowest-cost power supply option for Ridgewood residents remains on utility Basic Generation Service tariff. As a result, the Village has held the implementation of EAGER in abeyance.
Provided energy market conditions remain consistent or perhaps even improve further, EAGER and Gabel expect that a GEA program may be successful after the 2024 utility BGS auctions are complete, and the NJ utilities file their new tariffs that become effective June 1, 2024. By next year, the last of PSE&G’s ‘cheaper’ wholesale supply contracts that pre-date the change in energy market conditions will have expired, resulting in expectations for further utility tariff price increases next June. It is anticipated that, at that time, there could be a realistic opportunity for EAGER to deliver on its goal of obtaining greener power supply for residents at a price that meets or beats the utility tariff price. As GEA programs typically take six months to implement, EAGER and Gabel Associates Inc. anticipate starting to plan for a competitive bid process at the end of the 2023 calendar year, provided market conditions remain similar and/or show signs of further improvement.
EAGER and Gabel will continue to monitor energy markets for improvements. If a future bid results in competitive pricing and EAGER awards a contract for Round I, eligible Township residents (all residents except those who have their own solar generating system or their own third party supply contract, or those residents who have requested to be placed on the program’s ‘Do Not Disturb’ list), will be sent a mailing informing them of the details of the new contract, after which residents would have the choice of opting-out of the new program if they do not wish to participate. No further action will be necessary for residents who want to participate in the GEA program.
We look forward to working diligently with our consultant in the near future to achieve GEA supply options for our residents. Should you have any further questions, please feel free reach out to Gabel Associates at GEA-program@gabelassociates.com.
If you have any trouble with accessing information contained within this website, please contact the MIS Department - 201-670-5500 x2222 or by email mis@ridgewoodnj.net.